In the field attached to a local public house there’s a marquee where musical events are hosted. Weller Plant were asked to dig a narrow trench for a steel wire armoured cable.

- We dug a 25 metre long trench deep enough for the cable approx 750mm ( 30 inches ).
- We excavated in a straight line from the marquee to the outbuildings.
- The trench width was 100 mm ( 4 inches).
The whole job was completed in a couple of hours.
Find out more about our short term hire service or contact us for a quote today.
